Customization: | Available |
---|---|
Standard: | ANSI |
Material: | Low Carbon Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Hammer Union type mainly consists of Figure 100, Figure 200, Figure 206, Figure 300, Figure 400, Figure 600, Figure 602, Figure 1002, Figure 1003, Figure 1502 and Figure 2002, figure 2202
Hammer Union
We can provide various hammer unions based on the introduced technologies from other country,including thread connection type,welding type and H2S service unions.1"-6" and CWP of 1000psi-20,000psi unions are available.For easy identification,unions with different pressure ratings will be painted in different colors,and there are evident marks indicating size,connecting mode and pressure ratings.
Seal rings are made of quality rubber compound which greatly enhance load-bearing capacity and sealing performance and protect connectors from erosion.Different pressures and applications have different sealing method.
Fast Installation
Wherever they are,wing nuts and right ACME will ensure quick installation or dismantling without special tools.
Highly Interchangeable
All unions are made in American system,and can be interchanged with products in international market.Seal rings are fully interchangeable with equivalent products;Marks of size and pressure in wing nuts are formed in die-forging model,same as international products.
Size | 1/2"-12" | |||||||
Type | Male female thread union ,fmc weco fig100 200 206 600 602 1002 1003 1502 hammer union | |||||||
Thickness | 2000Lbs, 3000Lbs,6000Lbs( PD80, PD160,PDS) | |||||||
Material
|
Stainless steel(ASTM A182 F304, F304L,F316,F316L,F321,F347,F310F44F51,A276 S31803, A182, F43, A276 S32750,A705 631,632,A961, A484, | |||||||
Alloy steel(ASTM A694 F42,F46,F52,F56, F60,F65,F70, A182 F12,F11,F22,F5,F9,F91,F1ECT) |
||||||||
Qualification | ISO9001:2008 ,ISO 14001 OHSAS18001 , etc | |||||||
Packing | In wooded cases or pallets,or as for clients' requirements | |||||||
Application | Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, construction, etc | |||||||
Equipment | Huge Heat treatment furnace,PD-1500 lenge size radius induction pusher,PD1600T-DB1200 induction pusher,A grooving machine,Tube spraying grit treatment,etc | |||||||
Testing | Dircet reading spectrometer,Mechanical testing, Super living inspection,Magentic particle inspection,etc |
Figure 100 Hammer Union
Nominal pipe Size:2", 2-1/2", 3", 4" , 6" , 8";
Pressure Rating:1000psi cwp;1500 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Manifold and line connections.
Figure 200 Hammer Union
Nominal pipe Size:1", 1-1/4", 1-1/2",2", 2-1/2",3", 4";
Pressure Rating:2000psi cwp;3000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:General-service manifolds and lines.
Figure 206 Hammer Union
Nominal pipe Size:1", 2", 3",4",6",8", 10";
Pressure Rating:2000psi cwp;3000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Manifold and line connections, suction service, and corrosion service.
Figure 400 Hammer Union
Nominal pipe Size:2", 2-1/2", 3",4",6",8",10",12";
Pressure Rating:4000psi cwp;6000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Manifold and line connections, pump suction, and mud service.
Figure 600 Hammer Union
Nominal pipe Size:1", 2", 3", 4";
Pressure Rating:6000psi cwp;9000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Steam service, boiler connections, manifold, and line connections for production, drilling, and well servicing.
Figure 602 Hammer Union
Nominal pipe Size:1", 2", 3", 4";
Pressure Rating:6000psi cwp;9000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Manifold and line connections and mud service.
Figure 1002 Hammer Union
Nominal pipe Size:1", 2", 3", 4",5",6";
Pressure Rating: 1" to 4" 10000psi cwp;15000 psi test; 5" to 6" 7500psi cwp;12000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Cementing, fracturing, acidizing, testing, and choke and kill lines.
Figure 1003 Hammer Union
Nominal pipe Size:2", 3", 4",5";
Pressure Rating: 2" to 3" 10000psi cwp;15000 psi test; 4" to 5" 7500psi cwp;12000 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:For high-pressure connections where lines can't be aligned.
Figure 1502 Hammer Union
Nominal pipe Size:2", 3", 4";
Pressure Rating: 15000psi cwp;22500 psi test;
Connections Type: pipeline thread, tubing thread, butt-weld;
Component Parts: Nut, Male Sub, Female Sub, Seal Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Cementing, fracturing, acidizing, testing, and choke and kill lines.
Figure 2002 Hammer Union
Nominal pipe Size:2", 3";
Pressure Rating: 20000psi cold working pressure;
Connections Type: butt-weld;
Component Parts: Detachable Nut, Male Sub, Female Sub, Seal Ring, Retainer Segment, Retainer Ring;
Sour Service Models to NACE MR-01-75.
Recommended service:Cementing, fracturing, acidizing, testing, and choke and kill lines.
1.We will reply to your inquiry within two hours after receiving it, and arrange a special person to contact you. Please leave WhatsApp, WeChat and other communication tools as far as possible, so as to find yourself easily. If there is no response, please send a second letter.
2.Our company has a professional technical team and professional translators (Spanish, Arabic, Russian, and English). If you need to communicate with Russian service personnel, please inform them in advance by email.
3.We will provide the most competitive price in the Chinese market according to the requirements of your bidding documents to ensure the successful completion of your bidding project, so please give us sufficient preparation time, preferably the latest bid closing date.
FAQ
1. How is your workflow?