Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
API 6A Manual Choke Valve for Choke Manifold
The choke valve, a main component of Christmas tree, is design to control production rate of the oil well, with working pressure up to 15000psi. Choke valves can be classified as follows: adjustable choke valves and positive choke valves. By rotating hand wheel to move the stem, the adjustable choke valve is designed to adjust the effective area available for the flow to accomplish control of production rate. The positive choke valve is design to accomplish control of production rate by changing flow beans.
The coupling nut used for connecting the bonnet and body allows fast make-up and break-out.
Stem tip and bean adaptor are fabricated from special carbide alloys for corrosion and abrasion resistance. Indicator lens with scale marks allows the operator to know stem's position and actual orifice area. Turn hand wheel counter-clockwise and the valve will open; turn hand wheel clockwise and the valve will close. Adjustable choke valve Valve needle and spool are made of tungsten carbide, with sufficient corrosion resistant, antieroding and wearable capability. The two kinds of adjustable choke, pintle type and the sleeve type could apply to wellheads& X-mas tree and choke manifold. Positive choke valve Material of choke bean is fabricated from ceramic and tungsten carbide, with sufficient corrosion resistant, anti-eroding and wearable capability.
Features:
Main technical datum
Working Pressure: 2,000-20,000psi
Nominal Dimension: 2-1/16" ~ 7-1/16"
Working Temperature: P U
Product Specification Levels: PSL1 ~ 4
Performance Requirement: PR1 ~ 2
material Class: AA ~ FF
Working Medium: crude oil; natural gas.
It adopts union bonnet so as to change choke quickly
It has application in wellhead& X-mas tree and choke line.
SSpecificationpecification | Pressure of Work PSIPressure of Work PSI |
Connection | sAdjusting Formting Formg ForAdjusting Formm | Actuator | Operating Conditionrating Condition | ||
2'' | 15000 |
|
|
/ | STANDARD | ||
2'' | 15000 |
|
PIN | MANUAL | |||
3'' | 15000 | FIG1502(F*M) | PIN | ||||
2 1/16'' | 5000 | 2 1/16'' - 5000PSI API FLANGE | PLUNGER | ||||
2 1/16'' | 10000 | 2 1/16'' - 10000PSI API FLANGE |
|
1.We will reply to your inquiry within two hours after receiving it, and arrange a special person to contact you. Please leave WhatsApp, WeChat and other communication tools as far as possible, so as to find yourself easily. If there is no response, please send a second letter.
2.Our company has a professional technical team and professional translators (Spanish, Arabic, Russian, and English). If you need to communicate with Russian service personnel, please inform them in advance by email.
3.We will provide the most competitive price in the Chinese market according to the requirements of your bidding documents to ensure the successful completion of your bidding project, so please give us sufficient preparation time, preferably the latest bid closing date.
FAQ
1. How is your workflow?