Customization: | Available |
---|---|
After-sales Service: | 24/7 |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
STRUCTURE FEATURES
Annular BOP for Workover
Model |
FH18-21 |
FH18-35 |
Nominal diameter(in) |
7 1/16 |
7 3/8 |
Rated working pressure(psi) |
3000 |
5000 |
Strength pressure test(psi) |
6000 |
7500 |
Oil cylinder working pressure(psi) |
1200-1500 |
1200~1500 |
Piston stroke(mm) |
100 |
100 |
Metal temperature class(ºC) |
-29~121 |
-29~121 |
Nonmetal temp. class(ºC) |
-18~121 |
-18~121 |
Oil cylinder closed chamber volume(L) |
17 |
17 |
Oil cylinder open chamber volume(L) |
11.6 |
11.6 |
Bolt quantity and diameterc |
12-M30 x 3 x 140 |
12-M36 x 3 x 180 |
Ring gasket |
R45 |
R46 |
Dimension(mm) |
737 x 740 |
737 x 770 |
Weight(lb) |
2628 |
2690 |
Annular BOP for Well Driling
Model |
FH35-35 |
FH35-70 |
Nominal diameter(in) |
13 5/8 |
13 5/8 |
Rated working pressure(psi) |
5000 |
10000 |
Strength pressure test(psi) |
7500 |
7500 |
Oil cylinder working pressure(psi) |
1200-1500 |
1200~1500 |
Piston stroke(mm) |
100 |
100 |
Metal temperature class(ºC) |
-29~121 |
-29~121 |
Nonmetal temp. class(ºC) |
-18~121 |
-18~121 |
Oil cylinder closed chamber volume(L) |
17 |
17 |
Oil cylinder open chamber volume(L) |
11.6 |
11.6 |
Bolt quantity and diameterc |
12-M30 x 3 x 140 |
12-M36 x 3 x 180 |
Ring gasket |
R45 |
R46 |
Dimension(mm) |
737 x 740 |
1554x 1742 |
Weight(lb) |
2628 |
12750 |
1.We will reply to your inquiry within two hours after receiving it, and arrange a special person to contact you. Please leave WhatsApp, WeChat and other communication tools as far as possible, so as to find yourself easily. If there is no response, please send a second letter.
2.Our company has a professional technical team and professional translators (Spanish, Arabic, Russian, and English). If you need to communicate with Russian service personnel, please inform them in advance by email.
3.We will provide the most competitive price in the Chinese market according to the requirements of your bidding documents to ensure the successful completion of your bidding project, so please give us sufficient preparation time, preferably the latest bid closing date.
FAQ
1. How is your workflow?